Transmission & Distribution

T & D ARTICLES

Brazilian utilities Copel, Eletrosul, build transmission 'ring'

The project was concluded with the opening of the 90-mile Cascavel Oeste-Umuarama extension in Paraná state, according to a statement by Eletrosul

POWERGRID International wants your Project of the Year Award nominations

Any interested party, whether involved with the project or not, may submit an entry for consideration 

Los Angeles utility worker shocked by power line

About 460 customers were briefly left without power after the accident 

FEATURED VIDEO

TRANSMISSION & DISTRIBUTION WIRE NEWS

There is no current content available.

Wire News provided by

Subscribe Today -Electric Light & Power and POWERGRID International's semi-weekly power newsletter covers the latest news and trends in the energy and utility sector.

WHITE PAPERS

Rethinking Smart Grid Data Analytics From difficult-to-understand data stores to profitable business insight

What’s driving the boom in smart meter data? Why is it becoming more urgent to unlock its value? How can utilities approach data analytics not only...

Securing the Smart Grid: Achieving the Ultimate Goals of Safe Information Access

What security measures should your AMI system employ? Has your system security been evaluated by third parties? What would happen if a new threat w...

3D Interoperability for Multi-Dimensional Benefits

Previous 2-dimensional approaches to interoperability are quickly being replaced by more advanced, benefits-enhancing 3-dimensional methods of comm...

What is Best-in-Class in Contractor Management? White Paper

The What is Best-in-Class in Contractor Management? white paper delivers 10 strategic elements found in leading contractor management systems acros...

WEBCASTS

High Availability Networks. Application of IEC6439-3 Protocols for IEC61850 Process Bus implementation

Networks can now be built for the first time with genuinely uninterrupted data communication between sensors, drives and measuring equipment. These new techniques, PRP (Parallel Redundancy Protocol...
( 09/25/2014 / 01:00 PM

Understanding Moisture Dynamics in Power Transformers

While the need to measure moisture in power transformers has been well documented and is universally accepted, the understanding of how moisture moves within a transformer under various conditions ...
( 09/23/2014 / 09:00 AM

Regional Market Outlook for the WECC and ERCOT

Looking for an independent market outlook and analysis of the WECC and ERCOT power markets?  Join this webcast during which DNV GL (uniting the strengths of DNV, KEMA, GL and Garrad Hassan) wi...
( 09/11/2014 / 02:00 PM

Streamline Utility Field Inspections to Improve System Reliability &  Customer Satisfaction

Arm your workers with solutions that improve productivity and customer satisfaction. Listen in and learn from Intel, TC Technology, and Motion Computing.

POWERGRID INTERNATIONAL BUYER'S GUIDE

EtherMate® Industrial Ethernet - IO Modules

LioN-M ProfiNet device with 16 digital I/O channels, channels can be used universally as inputs o...

Low-Smoke Zero Halogen Premise Distribution Cable

AFL’s Low-Smoke Zero Halogen (LSZH) distribution cable offers all of the benefits of a traditiona...

TRM® 2.0 - Test Results Manager PC Analysis and Reporting

Test Results Manager 2.0 (TRM® 2.0) is an all-in-one analysis, viewer and reporting tool designed...

FEATURED ENERGY JOBS

View more Job Listings >>