Florida regulators OK Duke Energy rate hike

Sponsored by

Florida commissioners approved a deferment of Duke Energy Florida’s 2013 Nuclear Cost Recovery Clause proceeding to 2014. Regulators agreed to a rate increase for Duke Energy customers to help pay for the Crystal River nuclear plant in addition to a charge for the planned Levy County nuclear plant.

The rate increase comes to $5.62 in nuclear charges for a 1,000 kWh customer starting in January 2014. It breaks down to $2.17 for the failed CR3 uprate project, which would last up to seven years, and $3.45 for the deferred Levy project, which could last another two or three years.

Duke announced in February that it was shutting down the nuclear unit at the Crystal River plant after a 2009 upgrade project caused cracks in the containment building around the reactor. Attempts to fix those cracks in 2011 caused more cracks. Duke also said recently that it would shelve plans to build two new reactors at the site in Levy County, according to Power Engineering.

Commissioners also approved an administrative stipulation for Florida Power & Light that, in part, reduces the company’s recovery request by $1.6 million.

Sponsored by

WEBCASTS

Understanding Moisture Dynamics in Power Transformers

While the need to measure moisture in power transformers has been well documented and is universa...

Streamline Utility Field Inspections to Improve System Reliability &  Customer Satisfaction

Arm your workers with solutions that improve productivity and customer satisfaction. Listen in an...

Customers first: how utilities are using customer engagement to conquer new business challenges

Join ELP for a moderated discussion with Opower and Chartwell Research around customer engagement...

Building a Smart Utility: Distribution Network Optimization and Customer Engagement - The Efficiency Link

Attend the Schneider Electric live webcast to hear executives from Austin Energy and Burbank Wate...

EL&P BUYER'S GUIDE PRODUCTS

MITEM Corp

Provides CRM solutions for regulated U.S. public utilities. The product, MitemView integrates differently designed systems to share critical data a...

Resources on Demand

Manages resource requests, tracks personnel movements, and supports lodging/logistics during a power restoration event.

Smart Grids

Quanta is contributing to its customers' smart grid initiatives by installing technology on power networks to provide energy management solutions f...

Horizontal Directional Drilling

With 28 small, mid-sized and large drilling rigs, Quanta Pipeline Services is one of the largest horizontal directional contractors in the world fo...

POWERGRID BUYER"S GUIDE PRODUCTS

EtherMate® Industrial Ethernet - IO Modules

LioN-M ProfiNet device with 16 digital I/O channels, channels can be used universally as inputs or outputs, M12 socket, rotary address switches for...

Low-Smoke Zero Halogen Premise Distribution Cable

AFL’s Low-Smoke Zero Halogen (LSZH) distribution cable offers all of the benefits of a traditional 900 µm based optical cable while supporting comp...

OFL280 FlexTester - Handheld OTDR

AFL's OFL280 FlexTester offers an unmatched combination of fiber test functions, ease-of-use, portability, and value.

TRM® 2.0 - Test Results Manager PC Analysis and Reporting

Test Results Manager 2.0 (TRM® 2.0) is an all-in-one analysis, viewer and reporting tool designed for use with NOYES fiber and inspection products.

FEATURED ENERGY JOBS

View more Job Listings >>

POWERGRID International

April 2014
Volume 19, Issue 4
1404pg-cover

ELECTRIC LIGHT & POWER

January 2014
cover