Court rules in favor of Pattern Energy wind energy project

Sponsored by

Federal District Court for the Southern District of California ruled in favor of the Ocotillo Wind project and the Bureau of Land Management (BLM) in two separate suits before the court.

The court granted Pattern Energy Group's and the BLM's summary judgment motions in a case brought by the Quechan Tribe of the Fort Yuma Indian Reservation and in a separate case brought by several other parties, including the Desert Protective Council. 

In issuing its decisions the court denied the challenges to the Ocotillo project and dismissed each of the many claims that had been asserted against the project by the plaintiffs.

The court concluded that the BLM and Pattern conducted thorough studies of the effects of the project and had adopted appropriate mitigation measures to avoid or minimize the project's impact. This decision is the latest in a string of favorable rulings issued by the federal court rejecting challenges to the Ocotillo Wind project.

"We are pleased with the Federal Court's decisions," said Mike Garland, CEO of Pattern Energy. "These rulings confirmed that we and the BLM followed the rules, working with Native American tribes, community groups and local residents during the development process. We remain committed to building a renewable energy project responsive to the concerns of the local community and respectful of the environment and local cultural resources."

The Ocotillo Wind project, a 265 MW wind power project in Imperial Valley, has 94 wind turbines that are operational. The remaining 18 wind turbines will be installed in the spring. Once fully operational, the Ocotillo Wind project will provide enough clean and renewable energy to power nearly 125,000 homes in Southern California each year.

Ocotillo Wind will transmit power over the Sunrise Powerlink transmission line, which connects San Diego with the Imperial Valley.

San Diego Gas & Electric (SDG&E) and the California Independent System Operator Corporation (ISO), the agency that manages most of the statewide grid, consider the Sunrise Powerlink one of the important mitigation measures that will help maintain electric reliability during heat waves.

Nearly 70 percent of the Ocotillo Wind project was 'made in America,' using 112 Siemens wind towers, blades and nacelles that were manufactured in the United States. More than 500 jobs were created during the construction of the project, which used many workers and subcontractors from the local region. Ocotillo Wind will also generate substantial tax revenues over the next 30 years, benefiting Imperial County and local schools, among others.

Ocotillo Wind is Pattern's sixth operational wind project, bringing the company's total to more than 1000 MW of installed wind power capacity. Pattern expects to bring a number of wind projects into construction over the next 12 months.

Sponsored by
CURRENT ARTICLES

Beacon Power to build flywheel, battery energy storage system in Alaska

05/26/2015 The project will combine proven and durable high-power flywheel energy storage technology from Beacon Power, with an exist...

Massachusetts nuclear plant back online after upgrades

05/26/2015 Entergy, the owner of the Pilgrim Nuclear Power Station in Plymouth, announced that the plant returned to full service on ...

sPower breaks ground on 22 MW solar power park in Los Angeles County

05/26/2015

The Sierra Solar project is sPower’s first in Los Angeles County

ON DEMAND WEBCASTS

Solar + Storage: Capturing Opportunities and Overcoming Challenges

The convergence of solar and energy storage applications is under way. The combined application o...

Storage Enters the Global Stage: What’s the value proposition for your region?

For electricity storage, the events of the last two years have shown that the skepticism around t...

How to deploy mobile forms + devices to speed up field service processes & reporting

Overcoming the pain points associated with any process is much simpler and more cost effective th...

Beyond Integration: Three Dynamics Reshaping Renewables and the Grid

In a unique industry research initiative, DNV GL gathered views from over 1,600 energy sector par...

Engaging the Small and Mid-sized Business (SMB) Marketplace

This session will outline how Duke Energy leveraged Voice of Customer insights, previous experien...

INDUSTRY STOCKS

EL&P BUYER'S GUIDE PRODUCTS

Decontamination & Decommissioning

Decommissioning strategy development, cost estimates, plant modifications; system and building decontamination; RV segmentation; large component re...

Nuclear Horizontal Modular Storage (NUHOMS®)

AREVA TN’s NRC-licensed NUHOMS® system ensures the highest safety and lowest dose performance. With no tipping, tripping and sliding, you have the...

Cavitation Peening

AREVA developed its innovative solution for asset management, significantly extending the life of reactor components. Cavitation Peening is a perma...

Engineering Solutions

AREVA combines a unique blend of engineering expertise with equipment and system knowledge, rigorous project management experience and regulatory e...

POWERGRID PRODUCT LISTINGS

EtherMate® Industrial Ethernet - IO Modules

LioN-M ProfiNet device with 16 digital I/O channels, channels can be used universally as inputs or outputs, M12 socket, ro...

Low-Smoke Zero Halogen Premise Distribution Cable

AFL’s Low-Smoke Zero Halogen (LSZH) distribution cable offers all of the benefits of a traditional 900 µm based optical ca...

OFL280 FlexTester - Handheld OTDR

AFL's OFL280 FlexTester offers an unmatched combination of fiber test functions, ease-of-use, portability, and value.

TRM® 2.0 - Test Results Manager PC Analysis and Reporting

Test Results Manager 2.0 (TRM® 2.0) is an all-in-one analysis, viewer and reporting tool designed for use with NOYES fiber...

FEATURED ENERGY JOBS

View more Job Listings >>

POWERGRID International

March 2015
Volume 20, Issue 3
1503PG-cover

ELECTRIC LIGHT & POWER

January 2015
Volume 93, Issue 1
1501elp-cover